Application

Application (Short guide)

  1. Conduit ends must be clean and cut off evenly
  2. Firstly, blow air trough the conduit without shuttle, check if penetrable tube/correct tube
  3. Assemble shuttle correspending exactly to the Ø int. of tube
  4. Insert pull line through pull line supply and knot it tightly to the shuttle
  5. Place shuttle in the conduit and press EZ100 to the conduit, the front being movable for 360°
  6. Blow shuttle troug without interrupting
  7. Attach either cable/s or extra strong pull line and start pulling